How to read this dashboard
Where to start
Executive summary
Results since optimisation started, Green Mark standing, comfort and items that need attention. Built for presenting.
Results
Energy & savings, system efficiency and carbon — the evidence behind the summary.
Operations
Live AI setpoints for the chiller plant and air-handling units, indoor air quality, and faults. Built for the operations team.
Insights
Comparisons beyond the Green Mark figures: occupancy against fan speed and energy, unit against unit, air-handling units against the chiller plant, and efficiency against weather.
Present
Hides navigation and download buttons. Use ← and → to move between pages and Esc to exit.
Colours
Green
Within target or limit.
Amber
Needs watching or planning.
Red
Action needed now.
Coloured dots
Green Mark section the card supports: Energy Effectiveness, Intelligence, Health & Wellbeing, Maintainability, Resilience, Whole Life Carbon.
Terms
kW/RT
Electricity used per refrigeration tonne of cooling. Lower is better.
Total system efficiency
Chiller plant efficiency + air distribution efficiency, in kW/RT, from annual energy over annual cooling. Compared against Green Mark limits.
EE50 · EE55 · SLE60 · SLE70
Green Mark energy tiers: EE50 = GoldPLUS, EE55 = Platinum, SLE60 and SLE70 = Super Low Energy. Each has an EUI and a total system efficiency limit for the building type.
Minimum (kW/RT)
Green Mark's highest allowed total system efficiency for an existing building, 0.90 kW/RT. The tiers need lower values.
ACMV
Air-conditioning and mechanical ventilation: the chiller plant plus air distribution.
Chiller plant
Chillers, chilled-water (CHW) and condenser-water (CDW) pumps, and cooling towers (CT).
Air distribution
Air-handling units (AHU), pre-cooled air units (PAU) and fan coil units (FCU).
RT / RTh
Refrigeration tonne (cooling rate) / refrigeration tonne-hour (cooling delivered).
Adjusted baseline
Energy the system would have used without optimisation, adjusted for weather and load.
EUI
Energy use intensity — building energy per m² of floor area per year.
Outdoor air (OA)
Fresh air supplied for ventilation, compared with the code minimum.
ΔP
Pressure drop across a filter. Rising ΔP means the filter is loading up.
MTBF / MTTR
Mean time between failures / mean time to repair.
Heat balance
Check that the plant's measured cooling, heat rejected and power add up — confirms the meters are accurate.